nr |
titel |
auteur |
tijdschrift |
jaar |
jaarg. |
afl. |
pagina('s) |
type |
1 |
An EPQ model of ramp type demand with Weibull deterioration under inflation and finite horizon in crisp and fuzzy environment
|
Pal, Shilpi |
|
2014 |
156 |
C |
p. 159-166 8 p. |
artikel |
2 |
An integrated approach for ship block manufacturing process performance evaluation: Case from a Korean shipbuilding company
|
Park, Jaehun |
|
2014 |
156 |
C |
p. 214-222 9 p. |
artikel |
3 |
An operational policy for a three-stage distributive supply chain system with retailers’ backorders
|
Sarker, Bhaba R. |
|
2014 |
156 |
C |
p. 332-345 14 p. |
artikel |
4 |
Applying real options to IT investment evaluation: The case of radio frequency identification (RFID) technology in the supply chain
|
Dimakopoulou, Andriana G. |
|
2014 |
156 |
C |
p. 191-207 17 p. |
artikel |
5 |
A risk-averse competitive newsvendor problem under the CVaR criterion
|
Wu, Meng |
|
2014 |
156 |
C |
p. 13-23 11 p. |
artikel |
6 |
Closed-loop supply chain models for a high-tech product under alternative reverse channel and collection cost structures
|
Chuang, Chia-Hung |
|
2014 |
156 |
C |
p. 108-123 16 p. |
artikel |
7 |
Cyclic scheduling of perishable products in parallel machine with release dates, due dates and deadlines
|
Shirvani, Nargess |
|
2014 |
156 |
C |
p. 1-12 12 p. |
artikel |
8 |
Editorial Board
|
|
|
2014 |
156 |
C |
p. IFC- 1 p. |
artikel |
9 |
How durable should durable products be made under different scenarios of technological advance?
|
Qi, Lian |
|
2014 |
156 |
C |
p. 75-82 8 p. |
artikel |
10 |
How to calibrate conventional market-oriented organizational culture in 21st century production-centered firms? A customer relationship perspective
|
Guo, Chiquan |
|
2014 |
156 |
C |
p. 235-245 11 p. |
artikel |
11 |
Information and decision-making delays in MRP, KANBAN, and CONWIP
|
Gong, Qiguo |
|
2014 |
156 |
C |
p. 208-213 6 p. |
artikel |
12 |
Inventory management with simultaneously horizontal and vertical substitution
|
Ye, Taofeng |
|
2014 |
156 |
C |
p. 316-324 9 p. |
artikel |
13 |
Long- and short-term efficiency in an automobile factory: An econometric case study
|
Sáenz-Royo, Carlos |
|
2014 |
156 |
C |
p. 98-107 10 p. |
artikel |
14 |
Modeling and analyzing information delays in supply chains using transfer functions
|
Hoberg, Kai |
|
2014 |
156 |
C |
p. 132-145 14 p. |
artikel |
15 |
New AHP-based approaches for multi-criteria inventory classification
|
Lolli, F. |
|
2014 |
156 |
C |
p. 62-74 13 p. |
artikel |
16 |
Note on “The economic lot-sizing problem with remanufacturing and one-way substitution”
|
Piñeyro, Pedro |
|
2014 |
156 |
C |
p. 167-168 2 p. |
artikel |
17 |
On intermittent demand model optimisation and selection
|
Kourentzes, Nikolaos |
|
2014 |
156 |
C |
p. 180-190 11 p. |
artikel |
18 |
Online bounded-batch scheduling to minimize total weighted completion time on parallel machines
|
Ma, Ran |
|
2014 |
156 |
C |
p. 31-38 8 p. |
artikel |
19 |
Performance topology mapping: understanding the drivers of performance
|
Silvestro, Rhian |
|
2014 |
156 |
C |
p. 269-282 14 p. |
artikel |
20 |
Price competition and co-operation in a duopoly closed-loop supply chain
|
Kumar Jena, Sarat |
|
2014 |
156 |
C |
p. 346-360 15 p. |
artikel |
21 |
Pricing and product line strategy in a supply chain with risk-averse players
|
Xiao, Tiaojun |
|
2014 |
156 |
C |
p. 305-315 11 p. |
artikel |
22 |
Product development practices, manufacturing practices, and performance: A mediational perspective
|
Koufteros, Xenophon |
|
2014 |
156 |
C |
p. 83-97 15 p. |
artikel |
23 |
Random switching exponential smoothing and inventory forecasting
|
Sbrana, Giacomo |
|
2014 |
156 |
C |
p. 283-294 12 p. |
artikel |
24 |
Scheduling jobs with equal-processing-time on parallel machines with non-identical capacities to minimize makespan
|
Wang, Jun-Qiang |
|
2014 |
156 |
C |
p. 325-331 7 p. |
artikel |
25 |
Setting safety stocks for stable rotation cycle schedules
|
Rappold, James A. |
|
2014 |
156 |
C |
p. 146-158 13 p. |
artikel |
26 |
Some new problems on two-agent scheduling to minimize the earliness costs
|
Cheng, Shuenn-Ren |
|
2014 |
156 |
C |
p. 24-30 7 p. |
artikel |
27 |
Supply quality management with optimal wholesale price and revenue sharing contracts: A two-stage game approach
|
El Ouardighi, Fouad |
|
2014 |
156 |
C |
p. 260-268 9 p. |
artikel |
28 |
The green bullwhip effect: Transferring environmental requirements along a supply chain
|
Lee, Su-Yol |
|
2014 |
156 |
C |
p. 39-51 13 p. |
artikel |
29 |
The immediate impact of purchasing/sales contract announcements on the market value of firms: An empirical study in China
|
Yang, Jun |
|
2014 |
156 |
C |
p. 169-179 11 p. |
artikel |
30 |
The routed inventory pooling problem with three non-identical retailers
|
Bouma, Harmen W. |
|
2014 |
156 |
C |
p. 223-234 12 p. |
artikel |
31 |
The study of relationships between the collaboration for supply chain, supply chain capabilities and firm performance: A case of the Taiwan׳s TFT-LCD industry
|
Liao, Shu-Hsien |
|
2014 |
156 |
C |
p. 295-304 10 p. |
artikel |
32 |
Time-of-use based electricity cost of manufacturing systems: Modeling and monotonicity analysis
|
Wang, Yong |
|
2014 |
156 |
C |
p. 246-259 14 p. |
artikel |
33 |
Warranty return policies for products with unknown claim causes and their optimisation
|
Wu, Shaomin |
|
2014 |
156 |
C |
p. 52-61 10 p. |
artikel |
34 |
Yield and allocation management in a continuous make-to-stock system with demand upgrade substitution
|
Han, Guanghua |
|
2014 |
156 |
C |
p. 124-131 8 p. |
artikel |